Bathroom renovations in Richmond & Metro Vancouver.

A bathroom renovation needs tight sequencing and careful waterproofing. You get one point of contact for the written scope, materials, scheduling, site work, and the licensed plumbing or electrical trades required for the job.

What is included

A written scope built around your space.

The estimate identifies what is included, what you supply, stated allowances, expected timing, and which certified trades are required.

01

Demolition and disposal

02

Subfloor and wall preparation

03

Waterproofing and tile installation

04

Drywall, trim, and finishing

05

Vanity and fixture installation

06

Coordination of licensed plumbing and electrical trades

Four clear steps

From walk-through to handover.

01

Walk-through

We measure the room, review what stays or moves, and discuss finishes.

02

Written scope

You receive an itemised estimate, allowances, and an expected schedule.

03

Build

Demolition, preparation, certified trades, tile, and finishing follow one sequence.

04

Handover

We walk the room together and clear the agreed deficiency list.

From a local project

Bathroom tiling in Langley.

See a real installation in progress, with large-format wall tile and a laser reference visible on site.

View the project notes
Large-format bathroom wall tile installation in progress in Langley.

Frequently asked

Common questions about bathroom renovations.

How long does a bathroom renovation take?+

A typical full bathroom takes about 1 to 2 weeks. Layout changes, inspections, special-order materials, or extensive repair work can extend the schedule.

Can you convert a bathtub to a shower?+

Yes. The scope can include removal, plumbing coordination, a shower base or tiled pan, waterproofing, tile, and the shower enclosure.

Who handles plumbing and electrical work?+

Licensed plumbers and electricians are brought in when certified work is required. Their work is coordinated within the same project schedule.

Do I need to choose every finish before the estimate?+

No. The estimate can use clearly stated allowances, but final selections are needed before ordering and scheduling the related installation.

What can change the final bathroom price?+

Room size, concealed water damage, moving plumbing or framing, tile choice, custom glass, and fixture selections have the biggest effect.

Free written estimate

Tell us what you are planning.

Share your city, the work you have in mind, and your preferred timing. We will follow up to discuss your space and a no-obligation walk-through.

歡迎以廣東話或普通話聯絡,我們可協助您了解工程範圍及書面報價。

Call
778-885-0391
Have photos?
Text Matthew your project photos
Email
info@pacificanchorcontracting.ca
Service area
Metro Vancouver & the Fraser Valley

We reply within one business day. No obligation. Your information is used to respond to your enquiry. Privacy notice.