Pacific Anchor Contracting
Bathroom renovations in Richmond & Metro Vancouver.
Pacific Anchor Contracting renovates bathrooms in Richmond and across Metro Vancouver. Whether you’re updating a single ensuite or renovating several bathrooms, Matthew coordinates the written scope, scheduling, site work, and the licensed plumbing or electrical trades the job requires.
What is included
A written scope built around your space.
The estimate identifies what is included, what you supply, stated allowances, expected timing, and which certified trades are required.
Subfloor and wall preparation
Waterproofing and tile installation
Drywall, trim, and finishing
Vanity and fixture installation
Coordination of licensed plumbing and electrical trades
Four clear steps
From walk-through to handover.
Walk-through
We measure the room, review what stays or moves, and discuss finishes.
Written scope
You receive an itemised estimate, allowances, and an expected schedule.
Build
Demolition, preparation, certified trades, tile, and finishing follow one sequence.
Handover
We walk the room together and clear the agreed deficiency list.
Plan your bathroom
Choose what stays and what changes.
Start with how you use the bathroom every day. We’ll measure the room and identify which changes affect the plumbing, waterproofing, and time out of use.
Replace the bathtub
Keep the rest of the bathroom in place where practical. We check what will fit in the existing tub opening, including the shower base and glass enclosure.
Explore tub-to-shower conversionsRenovate the whole bathroom
Plan the shower or tub, vanity, fixtures, tile, and finishes together. Bring photos and a list of what you’d like to keep, replace, or move.
Request a written bathroom estimateRecent bathroom work
Finished shower details in Vancouver.
Textured tile, an illuminated recessed shelf, and shower fixtures. The project photos show the finished shower, frameless glass enclosure, tiled threshold, and lighting details.
View the project notes
Frequently asked
Common questions about bathroom renovations.
How long does a bathroom renovation take?+
A typical full bathroom takes about 1 to 2 weeks. Layout changes, inspections, special-order materials, or extensive repair work can extend the schedule.
Can you convert a bathtub to a shower?+
Yes. The scope can include removal, plumbing coordination, a shower base or tiled pan, waterproofing, tile, and the shower enclosure.
Who handles plumbing and electrical work?+
Licensed plumbers and electricians are brought in when certified work is required. Their work is coordinated within the same project schedule.
Do I need to choose every finish before the estimate?+
No. The estimate can use clearly stated allowances, but final selections are needed before ordering and scheduling the related installation.
What can change the final bathroom price?+
Room size, concealed water damage, moving plumbing or framing, tile choice, custom glass, and fixture selections have the biggest effect.
Free written estimate
Tell us what you are planning.
Share your city, the work you have in mind, and your preferred timing. We will follow up to discuss your space and a no-obligation walk-through.
歡迎以廣東話或普通話聯絡,我們可協助您了解工程範圍及書面報價。
- Call
- 778-885-0391
- Have photos?
- Text Matthew your project photos
- Service area
- Richmond & Metro Vancouver